GE LM6000 PD Sprint, 46MW, 11,500v. 50 Hz. Natural Gas Turbine-Generator






One (1) Power Plant with an GE LM6000 PD Sprint, 46 MW ISO, 11,500v. 50 Hz. Cogeneration, Natural Gas Turbine Generator.
Equipment Description
Gas Turbine Generator Set: 2009 Manufactured/2021 engine exchanged - GE LM600 PD Sprint Triple annular combustor
Condition: Engine exchanged by GE in March 2021 with factory refurbished unit. Last GE borescope (Dec. 2024) released the engine for operations, nevertheless, the engine is at the GE recommended HSE interval
Generator: Brush BDAX 7-290ERJT - 50.8 MW/ 63.5 MVA, 11,500v. 50 Hz. 0.8 P.F.
Gear Box: Lufkin NFVQ2419-D, ratio 1.209: 1
HRSG: DKME Korea DKS2107H01 - 52 t/hr. 103 barg, 313°C, single pressure, natural circulation
Gas Booster Compressors: 2X Ariel JGC/4 NGBC-A 97,280 Hrs., NGBC-B 5,800 Hrs.
Gas Circuit Breaker: ABB 4000A, 11 KV
Controls/Protection: Woodward, Mucronet Plus controller, Bently Nevada 3500 vibration monitoring
Inlet Air System: Eagle MERV 17, two-layer filtration with pulse-jet cleaning (Upgraded in 2024)
Additional Systems: CO2 Fire suppression, Siemens CEMS (Oxymat/Ultramat) Hydraulic, gas chromatograph spare parts inventory
Total Time: 98,153 hrs. / 486 starts. Hours since last engine replacement: 30,300 hrs. /98 starts
Hot Section Replacement as pre GE guidelines at 41,393
Power Plant is ready to be dismantled by actual owner of the Power Plant
Integrated Energy Networks
13915 Carryback Dr.
Dade City, Florida 33525
+1-904-333-6624